Do You Know Heavy Haul Rail?
The first International Heavy Haul Congress in 1978 was held in Perth, Australia. Since the establishment of the International Association of Heavy Haul Transport in 1985, the definition of heavy railroads has evolved with heavy loads and advancing with the time.
In 2005, the International Association of Heavy Load Associations proposed a new heavy haul railway standard that required to meet at least two of the following three conditions:
1.train traction quality is not less than 8000t
2.vehicle axle in the vehicle reach or exceed 27t
3.The length of the line is not less than 150 km, the annual freight volume is not less than 40 million tons.
We support several types of Rail Fastening System to meet the different rail's requirements.
评论
发表评论